Site survey and installation
We measure the site before the machine ships: door width, lift and floor load capacity, panel capacity, compressor flow, ventilation and extraction. That list is an annex to the order form. A machine that will not fit through your door is our mistake, not yours.
- 380 V / 3-phase + neutral + earth
- Ambient 18–28 °C, relative humidity 40–60%
- Installation and commissioning: 2–4 days
- First ICC profile and test print included